AIS General Layout & Circuit

132kV Switchyard
275kV Switchyard
Setiap circuit dalam substation mempunyai beberapa bay seperti yg disenaraikan, Setiap bay terdiri drpd primary equipment yg disenaraikan juga.

Overhead Line Bay
  • Busbar Isolator/Disconnector
  • Circuit Breaker
  • Current Transformer
  • Line Isolator with Earthing Facility
  • Capacitive Voltage Transformer
  • Surge Arrestor
Transformer Bay
  • Busbar Isolator/Disconnector
  • Circuit Breaker
  • Current Transformer
  • Capacitive Voltage Transformer
  • Surge Arrestor
  • Power Transformer
  • Earthing Transformer
  • NER System
Bus Coupler Bay
  • Busbar Isolator/Disconnector
  • Current Transformer
  • Circuit Breaker
  • Current Transformer
  •  Busbar Isolator/Disconnector
Busbar VT Bay
  • Busbar Isolator/Disconnector
  • Inductive Voltage Transformer
Shunt Capacitor Bay
  • Busbar Isolator/Disconnector
  • Circuit Breaker
  • Current Transformer
  • Line Isolator with Earthing Facility
  • Capacitive Voltage Transformer
  • Reactor
  • Surge Arrestor
  • Capacitor Bank
  • Unbalance Current Transformer
Underground Cable Feeder Bay
  • Busbar Isolator/Disconnector
  • Circuit Breaker
  • Current Transformer
  • Line Isolator with Earthing Facility
  • Capacitive Voltage Transformer
  • Surge Arrestor
  • Cable Sealing End

Single Line Diagram

Single Line Diagram 500/275kV
Single Line Diagram 275/132kV
Single Line Diagram 33/11kV
Yang sume kt atas nie adalah contoh single line diagram drawing dr 500kV hingga 11kV. SLD nie mewakili sistem kuasa dalam tiga phase(fasa). Sume komponen dlm substation bley diketahui dgn melihat SLD nie termasuk dari primary ke secondary equipment (bdasarkan CT ratio). SLD adalah drawing yg disimplekn. So ia senang difahami.

Monday 15 July 2013

Site Handing Over PMU Kandis

Area of new 33/11kV Control Building
From 275kV Transformer to new 132kV Transformer Bay
2 Transformer Bay Extension
132kV Switchyard
132kV Switchyard
Inside DC Charger
132kV Bus Coupler Control Panel
275kV Busbar Protection Panel (High Impedance)
Areva T&D Kits for SIMS (Substation Interrogation Monitoring System)
FACIA for 275kV Remote Tap Changer Control Panel
Indicator at 275kV RTCC Panel
275kV Overhead Line Control and Relay Panel
  •  Expansion of AIS 132/33kV Transformer Bays include Civil Works (33/11kV Control Building)
  • Design Review for 45MVA 132/33kV Power Transformer
  • Expansion of Secondary Equipment (CRP, RTCC, BBX, etc)
  • Expansion of Telecontrol Equipment (SCS for 132kV, RTU for 33kV)

Sunday 14 July 2013

Site Handing Over PMU Port Klang

275kV Overhead Line Bay
275kV AIS Surge Arrestor
AREVA T&D Line Disconnector
Busbar, Post Insulator & Busbar Disconnector
275kV SF6 Gas Circuit Breaker
Relay - Main 1 Current Differential
Fault Recorder BEN 5000 (Obsolete)
Relay Panel (Panel 1)
Relay Panel (Panel 2)
Busbar Protection Panel
Circuit Breaker and Current Transformer
Surge Arrestor
  • Upgrading from 683MVA to 1000MVA (1 x 275kV Overhead Line Bay)
  • Dismantling existing primary equipment and exchange with TNB free issue items
  • Expansion on Secondary and Telecontrol Equipment (Remote Terminal Unit) with Fault Recorder

Mabul Island Trip