Site Handing Over PMU Kandis

Area of new 33/11kV Control Building
From 275kV Transformer to new 132kV Transformer Bay
2 Transformer Bay Extension
132kV Switchyard
132kV Switchyard
Inside DC Charger
132kV Bus Coupler Control Panel
275kV Busbar Protection Panel (High Impedance)
Areva T&D Kits for SIMS (Substation Interrogation Monitoring System)
FACIA for 275kV Remote Tap Changer Control Panel
Indicator at 275kV RTCC Panel
275kV Overhead Line Control and Relay Panel
  •  Expansion of AIS 132/33kV Transformer Bays include Civil Works (33/11kV Control Building)
  • Design Review for 45MVA 132/33kV Power Transformer
  • Expansion of Secondary Equipment (CRP, RTCC, BBX, etc)
  • Expansion of Telecontrol Equipment (SCS for 132kV, RTU for 33kV)